Daysh Building
Project duration – 4 months
Project value – £300k
Contractor – SRM
The Daysh building was built in 1968 to house a total of 13 departments including languages, law and geography.
Bauder Blue Roof SUDS (sustainable urban drainage system) is a sustainable drainage method designed to manage stormwater on a flat roof. Used in flood sensitive areas.
We then removed and reinstalled the solar panels upon completion of the roof installation.