Lakes Primary School

Project duration – 4 months
Project value – £400k
Contractor – Sanderson & Weatherall
The Lakes Primary School opened in 1963.
Working with Sanderson Weatherall, John Flowers Flat and Industrial Roofing replaced their guttering system.
The project included installing an Alumasc Caltech Liquid Gutter System comprising of 1600lm.
The Alumasc Caltech System provides flexible, durable, long-lasting protection for up to 25 years.
- DCIM100MEDIADJI_0349.JPG
- DCIM100MEDIADJI_0354.JPG
- DCIM100MEDIADJI_0382.JPG